Skip to content

external-dns-operator: release-1.2: Change cluster profile to aws-qe for shared-vpc test#75663

Merged
openshift-merge-bot[bot] merged 1 commit intoopenshift:mainfrom
grzpiotrowski:edo-release-1.2-cluster-profile
Mar 4, 2026
Merged

external-dns-operator: release-1.2: Change cluster profile to aws-qe for shared-vpc test#75663
openshift-merge-bot[bot] merged 1 commit intoopenshift:mainfrom
grzpiotrowski:edo-release-1.2-cluster-profile

Conversation

@grzpiotrowski
Copy link
Contributor

Update CI configuration for EDO release-1.2 with a different cluster-profile aws-qe which has the required
.awscred_shared_account credentials for shared VPC testing.

The change was already done for the main EDO branch in PR #66025.

@openshift-ci openshift-ci bot requested review from davidesalerno and gcs278 March 4, 2026 11:50
@openshift-ci openshift-ci bot added the approved Indicates a PR has been approved by an approver from all required OWNERS files. label Mar 4, 2026
Copy link
Contributor

@alebedev87 alebedev87 left a comment

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

/lgtm
/approve

@openshift-ci openshift-ci bot added the lgtm Indicates that a PR is ready to be merged. label Mar 4, 2026
@grzpiotrowski grzpiotrowski force-pushed the edo-release-1.2-cluster-profile branch from f5223a8 to 84bfe59 Compare March 4, 2026 12:02
…for shared-vpc test

Update CI configuration for EDO release-1.2 with a different
cluster-profile `aws-qe` which has the required
`.awscred_shared_account` credentials for shared VPC testing.

The change was already done for the main EDO branch in: openshift@96c9a46
@grzpiotrowski grzpiotrowski force-pushed the edo-release-1.2-cluster-profile branch from 84bfe59 to 59e13a9 Compare March 4, 2026 13:52
@openshift-ci openshift-ci bot removed the lgtm Indicates that a PR is ready to be merged. label Mar 4, 2026
@openshift-ci-robot
Copy link
Contributor

[REHEARSALNOTIFIER]
@grzpiotrowski: the pj-rehearse plugin accommodates running rehearsal tests for the changes in this PR. Expand 'Interacting with pj-rehearse' for usage details. The following rehearsable tests have been affected by this change:

Test name Repo Type Reason
pull-ci-openshift-external-dns-operator-release-1.2-e2e-aws-shared-vpc-phz-operator openshift/external-dns-operator presubmit Ci-operator config changed
Interacting with pj-rehearse

Comment: /pj-rehearse to run up to 5 rehearsals
Comment: /pj-rehearse skip to opt-out of rehearsals
Comment: /pj-rehearse {test-name}, with each test separated by a space, to run one or more specific rehearsals
Comment: /pj-rehearse more to run up to 10 rehearsals
Comment: /pj-rehearse max to run up to 25 rehearsals
Comment: /pj-rehearse auto-ack to run up to 5 rehearsals, and add the rehearsals-ack label on success
Comment: /pj-rehearse list to get an up-to-date list of affected jobs
Comment: /pj-rehearse abort to abort all active rehearsals
Comment: /pj-rehearse network-access-allowed to allow rehearsals of tests that have the restrict_network_access field set to false. This must be executed by an openshift org member who is not the PR author

Once you are satisfied with the results of the rehearsals, comment: /pj-rehearse ack to unblock merge. When the rehearsals-ack label is present on your PR, merge will no longer be blocked by rehearsals.
If you would like the rehearsals-ack label removed, comment: /pj-rehearse reject to re-block merging.

@openshift-ci
Copy link
Contributor

openshift-ci bot commented Mar 4, 2026

@grzpiotrowski: all tests passed!

Full PR test history. Your PR dashboard.

Details

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the kubernetes-sigs/prow repository. I understand the commands that are listed here.

@alebedev87
Copy link
Contributor

/lgtm

@openshift-ci openshift-ci bot added the lgtm Indicates that a PR is ready to be merged. label Mar 4, 2026
@openshift-ci
Copy link
Contributor

openshift-ci bot commented Mar 4, 2026

[APPROVALNOTIFIER] This PR is APPROVED

This pull-request has been approved by: alebedev87, grzpiotrowski

The full list of commands accepted by this bot can be found here.

The pull request process is described here

Details Needs approval from an approver in each of these files:

Approvers can indicate their approval by writing /approve in a comment
Approvers can cancel approval by writing /approve cancel in a comment

@grzpiotrowski
Copy link
Contributor Author

/pj-rehearse ack

...since the fix was already done for main branch in #66025 and confirmed there.

@openshift-ci-robot
Copy link
Contributor

@grzpiotrowski: now processing your pj-rehearse request. Please allow up to 10 minutes for jobs to trigger or cancel.

@openshift-ci-robot openshift-ci-robot added the rehearsals-ack Signifies that rehearsal jobs have been acknowledged label Mar 4, 2026
@openshift-merge-bot openshift-merge-bot bot merged commit 912da29 into openshift:main Mar 4, 2026
15 checks passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

approved Indicates a PR has been approved by an approver from all required OWNERS files. lgtm Indicates that a PR is ready to be merged. rehearsals-ack Signifies that rehearsal jobs have been acknowledged

Projects

None yet

Development

Successfully merging this pull request may close these issues.

3 participants