Skip to content

Pull requests: openshift/release-controller

Author
Filter by author
Loading
Label
Filter by label
Loading
Use alt + click/return to exclude labels
or + click/return for logical OR
Projects
Filter by project
Loading
Milestones
Filter by milestone
Loading
Reviews
Assignee
Filter by who’s assigned
Assigned to nobody Loading
Sort

Pull requests list

OCPCRT-455: Add splay configuration to stagger verification job start times do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#737 opened Mar 11, 2026 by stbenjam Loading…
Add EndOfSupport flag
#726 opened Feb 20, 2026 by sarthakpurohit Loading…
Docs around release-controller lifecycle/rotten Denotes an issue or PR that has aged beyond stale and will be auto-closed.
#718 opened Nov 19, 2025 by deepsm007 Loading…
Update garbage collection do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command.
#717 opened Nov 18, 2025 by deepsm007 Loading…
ProTip! Mix and match filters to narrow down what you’re looking for.