Notifications
You must be signed in to change notification settings - Fork 5
Expand file tree
/
Copy pathINPUTC
More file actions
98 lines (74 loc) · 3.58 KB
/
INPUTC
File metadata and controls
98 lines (74 loc) · 3.58 KB
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
NOTE:ANY INFORMATION INCLUDED BEFORE ZZTC AND AFTER ZZND IS IGNORED BY THE
PROGRAM.
ZZTC:TITLE CARD
S.N. DESCRIPTION [new STUART NELSON LINK Z & CAPS]
ZZMC:MISCELLANEOUS. LOSS SHARING=0 NO LOSS SHARING=1
SEED LS END WKS WHERE WHEN KVS KVT KVL CVT FIN STEP FREQ MAXE II IJ IR IN D M
W1 IW2 IW3
ZZLD:SYSTEM DATA. AREA NAME IN FOUR LETTERS.
S.N. AREA NAME PEAK LFU OUTAGE WINDOW FORBIDDEN PERIOD SUM OF FLOWS
(MW) % BEG WK END WK BEG WK END WK CONSTRAINT
ZZUD:UNIT DATA
UN NAME - UNIT NAME IN SIX LETTERS. FIRST FOUR LETTERS ARE THE PLANT NUMBER
AND NEXT TWO NUMBERS IDENTIFY THE UNIT.
LOC - AREA OF LOCATION, FOUR LETTERS.
CAPI - UNIT CAPACITY DURING I-TH SEASON.
DFOR - DERATED FORCED OUTAGE RATE.
FOR - FORCED OUTAGE RATE.
DER - PERCENT DERATING.
P/A - PREDETERMINED (1) OR AUTOMATIC (0) SCHEDULING.
B1, D1 - BEGINNING WEEK AND DURATION OF FIRST OUTAGE.
B2, D2 - BEGINNING WEEK AND DURATION OF SECOND OUTAGE.
S.N. UN NAME LOC CAP1 CAP2 CAP3 CAP4 DFOR FOR DER P/A B1 D1 B2 D2
ZZFC:FIRM CONTRACTS. AREA INDICATED BY FOUR LETTERS. CONTRACT LOAD FLOW
S.N. FROM AREA TO AREA BEG DAY END DAY MW MW
ZZOD:UNIT OWNERSHIP DATA
S.N. UN NAME PERCENT OWNERSHIP OF AREA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
ZZTD:LINE DATA
S.N. LINE NUMBER FROM TO ADM CAP CAPR PROB (STATE 1)
ADM CAP CAPR PROB (STATE 2)
ADM CAP CAPR PROB (STATE 3)
ADM CAP CAPR PROB (STATE 4)
ADM CAP CAPR PROB (STATE 5)
ADM CAP CAPR PROB (STATE 6)
ZZDD:LINE DERATING DATA
S.N. LINE NUMBER UNITS DERATING THIS LINE DERATING FACTORS
UNIT1 UNIT2 UNIT3 UNIT4 FORWARD BACKWARD
ZZND:TERMINATING CARD
DESCRIPTION OF VARIABLES IN CARD ZZMC
-------------------------------------
VARIABLES FOR CONVERGENCE TEST:
KWHERE : 1 = AREA (TO BE SPECIFIED)
2 = POOL
WVWHEN : 1 = HOURLY STATISTICS
2 = PEAK STATISTICS
KVSTAT : 1 = LOLE
2 = EUE (USED ONLY WITH HOURLY STATS)
KVTYPE : 1 = WEIGHTED AVERAGE OF STATS, CONSIDERING FORECAST ERROR)
2 = USE ONLY THE NO FORECAST ERROR STATISTIC
KVLOC : AREA NUMBER (USED ONLY IF KWHERE = 1)
CVTEST : 0 = STOP WHEN STANDARD DEVIATION OF THE TESTED STATISTIC
IS LESS THAN (.025*MEAN),I.E.,WHEN WE ARE 95% CONFIDENT
THE ESTIMATE IS WITHIN 5% OF TRUE VALUE.
>0 = STOP WHEN STANDARD DEVIATION IS LESS THAN CVTEST.
FIN : TIME TO END SIMULATION IF NO CONVERGENCE. IT SHOULD BE
MULTIPLE OF 8760.
OTHER VARIABLES:
STEP : 1 = COLLECT STATS EVERY HOUR.
24 = DAILY PEAK STATS ONLY.
FREQ : 1 = USE HOURLY MONTE CARLO DRAWS OF GENERATOR AND LINE STATUS.
24 = USE DAILY MONTE CARLO DRAWS.
MAXE : DEFINES THE UPPER LIMIT OF THE PROB DISTRIBUTION OF EUE.
II : 0 = DO NOT PRINT TRANSMISSION MOD RESULTS.
1 = PRINT TRANSMISSION MOD RESULTS.
IJ : 0 = DO NOT PRINT AFTER EACH REPLICATION
IR : 0 =DELETE DUMP AFTER THE RUN
1 = RETAIN DUMP AFTER THE RUN
IN : INTERNAL, IN NUMBER OF REPLICATIONS, FOR STORING
THE CONTENTS OF ARRAYS FOR RESTART.
1 = PRINT AFTER EACH REPLICATION
D : 0 = DO NOT PRINT INPUT DATA
1 = PRINT INPUT DATA
M : 0 = DO NOT PRINT PLANNED OUTAGE SCHEDULES
1 = PRINT PLANNED OUTAGE SCHEDULES