Skip to content

chore(deps): lock file maintenance #10399

chore(deps): lock file maintenance

chore(deps): lock file maintenance #10399

Triggered via pull request March 16, 2026 21:16
Status Failure
Total duration 3m 25s
Artifacts

build.yml

on: pull_request
Matrix: tests
Fit to window
Zoom out
Zoom in

Annotations

9 errors
Tests (Node.js v20.9.0, ubuntu)
Process completed with exit code 1.
Tests (Node.js v24, windows)
The strategy configuration was canceled because "tests._20_9_0_ubuntu" failed
Tests (Node.js v24, windows)
The operation was canceled.
Tests (Node.js v24, ubuntu)
The strategy configuration was canceled because "tests._20_9_0_ubuntu" failed
Tests (Node.js v24, ubuntu)
The operation was canceled.
Tests (Node.js v22, ubuntu)
The strategy configuration was canceled because "tests._20_9_0_ubuntu" failed
Tests (Node.js v22, ubuntu)
The operation was canceled.
Tests (Node.js v25, ubuntu)
The strategy configuration was canceled because "tests._20_9_0_ubuntu" failed
Tests (Node.js v25, ubuntu)
The operation was canceled.